Due to the system concept, on-site precautions for mechanical protection, cable management, and fire protection must be implemented in accordance with local regulations, and air conditioning must be provided in accordance with the manufacturer's specifications.
Detailed information on this can be found in the manufacturer's documentation (instructions and warranty) and must be observed.
Due to the high weight, sufficient load-bearing capacity must be ensured at the installation site. The base must be leveled.
For more than 6 storage modules, these must be installed in multiple towers (see instructions).
The storage modules may only be stored in their standard installation position. According to the manufacturer's specifications, storage on their side, upright, or upside down is not permitted.