The new S2 cabinet version is not compatible with the S1.
The manufacturer's instructions regarding transport, storage, preparation, and installation must be strictly followed.
Appropriate commissioning support must be purchased separately. Alternatively, certification training can be completed.
This storage expansion can only be used for a system of the same capacity.
Due to the liquid cooling system, the system is delivered fully pre-assembled. Suitable vehicles for unloading and transport must be used.
When connecting multiple systems, additional components and cable sets are required.
Transport, assembly, and installation must be carried out by the customer prior to commissioning. The required installation materials must be verified against the instructions and the local conditions and provided by the customer.
Please check the necessity of an external EMS (Energy Management System) based on your project-specific parameters and planned components to provide, for example, the required control interfaces. This may need to be added separately. We are happy to assist you in selecting suitable providers.